PROJECT DESCRIPTION
The H2 Pillar Cluster consists of four renewable energy projects with a combined transfer capacity of 47 MW. These include three wind farms with a total capacity of 40MW and one solar farm with a capacity of 7 MWp, as well as a green hydrogen production plant.
These projects are located in the municipalities of Fuentes de Ebro and El Burgo de Ebro in Aragon, Spain, an area with fully assured wind and solar resources. The green hydrogen plant is strategically located near the future trunk network for green hydrogen distribution.
This cluster is being developed in partnership with Enagás Renovables and the Danish investment fund CIP.
In design stage.
Estimated start of construction in 2025.
GENERAL CHARACTERISTICS
ESPARTAL WIND FARMS 1, 3 and 4
TOTAL
CAPACITY
40 MW
ESTIMATED
PRODUCTION
117,438
GWh/year
ESPARTAL SOLAR FARM 2
TOTAL
CAPACITY
7 MWp
ESTIMATED
PRODUCTION
45,012
GWh/year