PROJECT DESCRIPTION

Located in the municipality of Épila in Aragon, Spain, the Rueda Sur Cluster has a total installed capacity of 188 MW. It includes three wind farms, each with a capacity of 45 MW, and two solar farms with a combined capacity of 53 MWp (48 MWn).

The design and strategic location of this cluster enable future hybridisation and the potential integration of storage batteries.


In operation since 2026
.

GENERAL CHARACTERISTICS

RUEDA SUR WIND 1 (A), 2 (B), 3 (C)

CEAR - Icono eolico

TOTAL
CAPACITY

135 MW

CEAR - Icono eolico

ESTIMATED
PRODUCTION

395,945

GWh/year

RUEDA SUR WIND 1 (D) and 2 (E)

CEAR - Icono solar

TOTAL
CAPACITY

53 MWp

CEAR - Icono solar

ESTIMATED
PRODUCTION

106,017

GWh/year