PROJECT DESCRIPTION

Located in the municipality of Épila in Aragon, Spain, the Rueda Sur Cluster has a total installed capacity of 188 MW. It includes three wind farms, each with a capacity of 45 MW, and two solar farms with a combined capacity of 53 MWp (48 MWn).

The design and strategic location of this cluster enable future hybridisation and the potential integration of storage batteries.

Under construction.
Estimated commissioning between 2025 and 2026
.

GENERAL CHARACTERISTICS

RUEDA SUR WIND 1 (A), 2 (B), 3 (C)

CEAR - Icono eolico

TOTAL
CAPACITY

135 MW

CEAR - Icono eolico

ESTIMATED
PRODUCTION

395,945

GWh/year

RUEDA SUR WIND 1 (D) and 2 (E)

CEAR - Icono solar

TOTAL
CAPACITY

53 MWp

CEAR - Icono solar

ESTIMATED
PRODUCTION

106,017

GWh/year