
PROJECT DESCRIPTION
The Tico Cluster, located in the municipalities of Villar de los Navarros and Azuara in Aragon, Spain, boasts a total installed capacity of 263.7 MW. It comprises a wind farm with a capacity of 180 MW and two solar farms with a combined capacity of 83.7 MWp (69.9 MWn).
In operation since 2021–2022.
GENERAL CHARACTERISTICS
TICO WIND FARM
TOTAL
CAPACITY
180 MW
ESTIMATED
PRODUCTION
557,640
GWh/year
TICO SOLAR FARMS 1 AND 2
TOTAL
CAPACITY
83 MWp
ESTIMATED
PRODUCTION
167,015
GWh/year

